Specialized in Piling

CONCRETE PILE SHORING WORKS

EXCAVATIONS AND SHORING

EXCELLENCE IN CONSTRUCITON SINCE 2003

BRIDGE DIVISION

RAILROAD DIVISION

INDUSTRIAL DIVISION

WHY CHOOSE US?

We intend on becoming the recognized leader in providing services for the piling industry in the VAGI MIDDLE EAST PILING CONTRACTING LLC and aspiring to be the most preferred engineering solutions provided for our clients in our field of expertise by executing projects in a safe, timely and quality oriented manner, thereby committing to our slogan of “Excellence, Integrity, Efficiency”

VMEPC is a company devoted to providing exceptional services to its clients ensuring professionalism, dedication and our commitment towards excellence, efficiency and integrity. We promise long lasting relationships with consistent profitability while retaining mutually beneficial relationships with all our esteemed Clients, Consultants, Suppliers, Subcontractors and our Employees

VMEPC’s Core Values represent who we are and provide without question, the standard of behavior by which we conduct business. These values are the heart and soul of VMEPC. Our Code embodies the Vision of our company for our future success. Our core values represent how we treat each other, how we deal with our customers, how we respond to our partners the Suppliers and or Consultants, and on how we hold each other and ourselves accountable. This is the legacy will leave for the generations to come. The Core Values to which we hold the conduct of our business are EXCELLENCE, INTERGRITY AND EFFICIENCY

VAGI MIDDLE EAST PILING CONTRACTING LLC believes that Health Safety & Environment Protection is of everybody’s concern and therefore it is vital to the ultimate success of the organization. The entire responsibilities in implementing H.S.E system rest with the line management and under any circumstances, operation activities should not take priority over safety.

ABOUT US

  • image
  • image
  • image
  • image

PILING WORKS

Equipments and Working Platform

The piles will be constructed in each area from a working platform level, as mentioned in the Consultants Drawings.

Setting out of Piles

Shop drawings for pile layout and pile details are submitted for approval. Pile centers are set at site as per grid lines and deviations.

Installation of Temporary Casing

A temporary casing of suitable 3.00 m length and of required diameter will be installed depending upon the characteristics of the topsoil.

Pile Excavation

The boring operation will be carried out by means of self-erecting hydraulic drilling rig. In case of any hard strata encountered during drilling.

Disposal of Excavated Material

The excavated material will be temporarily stocked close to the drilling machine. It will be subsequently loaded to truck by shovel loader and transported to the disposal area.

Cleaning of Piles:

If the pile has been waiting for more than 4 hours to start pouring of concrete, the pile hole should be cleaned by using the bucket.

OUR PROJECTS

All
Architecture
Building
Garden
Interior
Office

LUXURY BUILDINGS

Architecture,

LUXURY BUILDINGS

Building, Office,

LUXURY BUILDINGS

Architecture, Garden, Interior,

LUXURY BUILDINGS

Building, Interior,

LUXURY BUILDINGS

Architecture, Garden, Office,

LUXURY BUILDINGS

Architecture, Garden, Office,

LUXURY BUILDINGS

Architecture, Garden, Office,

COMPANY ACTIVITIES

PILING WORKS

  • Bored cast in situ piles of diameter 400 mm to 2500 mm
  • Bored cast in situ piles (C.F.A System) of diameter 400 mm to 750 mm50 mm

SOIL ENGINEERING WORKS

  • Soil Improvement
  • Soil Stabilization

SHORING WORKS

  • Diaphragm Wall
  • Secant Pile Wall
  • Contiguous Pile Wall

GROUND ANCHORS WORKS

  • Support System / Foundation System.

DEWATERING WORKS

  • Land drainage and dewatering.
  • Manufacturing Dewatering pumps, Contractors pumps, Process pumps, Hoses, Couplings and other accessories.

VAGI MIDDLE EAST PILING CONTRACTING L.L.C

AWESOME FACTS

127
PROJECT COMPLETED
280
SATISFIED CLIENTS
310
WORKERS EMPLOYED